BuyWhatFits

What EV Charger Do You Need for a 2023 Lucid Air GT P?

What to buy
A 80 A charger on a 100 A circuit
Your 2023 Lucid Air GT P accepts at most 19.2 kW (80 A) of AC power. A larger charger will not charge it faster.

Buying a 48-amp or 50-amp charger for this car wastes money because the onboard charger handles up to 80 amps. Your 2023 Lucid Air GT P needs an 80-amp Level 2 setup to reach its maximum AC charging rate of 19.2 kilowatts. Without that hardware, you leave rated speed on the table. Plan for a high-output circuit right away.

Matches your car
Autel MaxiCharger Level 2 80A
80 A · J1772 · hardwire
See it on Amazon

The numbers

Maximum AC charging rate19.2 kW (80 A)
Charger size to buy80 A
Circuit breaker required100 A
Outlet / connectionhardwired only
Charge portJ1772
Full charge on Level 2about 7.1 hours
Range added per hour (Level 2)about 63 miles
Full charge on a 120 V outletabout 94 hours
Range added per hour (120 V)about 4.7 miles
EPA rated range446 miles
Energy for a full chargeabout 135.9 kWh at the wall

Why 80 amps and not more

The 135.9 kWh battery pack demands massive power input to refill overnight. Pumping 80 amps into the J1772 connector yields 63 miles of range per hour. A smaller 48-amp unit drops your replenishment rate sharply, dragging out the total time needed to hit full capacity. Hooking up anything smaller than the recommended 80-amp equipment means your car sits plugged in for hours longer than necessary. Feed the vehicle what it asks for.

What the install involves

Do not look for a standard wall outlet for this job. You need a dedicated hardwired installation on a 100-amp breaker to safely deliver the continuous current. Copper wiring sizing must match that 100-amp load without exception. Call a licensed electrician immediately for this run, as residential panels rarely have an 80-amp continuous continuous-duty slot open without a load calculation. Safety rules forbid DIY shortcuts here.

Chargers that match this car

The first unit matches your car's full 80 A. The others are slightly slower but cost less.

MaxiCharger Level 2 80A
80 A · J1772 · hardwire · 25.0 ft cable
One of the few home units that can feed an 80 A car. Needs a 100 A circuit.
See the Autel MaxiCharger Level 2 80A
Home Flex 50A Hardwired
50 A · J1772 · hardwire · 23.0 ft cable
Adjustable from 16 A to 50 A in the app, which helps if your panel is tight.
See the ChargePoint Home Flex 50A Hardwired
Level 2 EV Charger 48A
48 A · J1772 · both · 24.0 ft cable
Energy monitoring built in. Hardwire it for the full 48 A.
See the Emporia Level 2 EV Charger 48A

Worth having as well

Tesla to J1772 Charging Adapter 80A
Lets a J1772 car use Tesla Destination Chargers and Wall Connectors.
See the Lectron Tesla to J1772 Charging Adapter 80A
J1772 Extension Cable 20ft 40A
For when the charger cable will not reach your car's port.
See the EVCONN J1772 Extension Cable 20ft 40A
As an Amazon Associate we earn from qualifying purchases. Prices and availability are not shown here because they change constantly, so check the current price on Amazon.

Common questions

Can I plug this car into a standard 120-volt household outlet?
Yes, but Level 1 charging adds only 4.7 miles of range per hour. Taking the 135.9 kWh battery from empty to full this way takes 94 hours. Treat standard outlets as an emergency backup only.
Why does the EPA charge time differ from the maximum rate?
The EPA test protocol does not run at the car's peak AC rate, which explains the 13-hour duration listed in official tests. Real-world charging at the full 19.2 kW rate finishes the job in 7.1 hours.
Do I need a plug-in unit or a hardwired unit?
This vehicle requires a hardwired setup. No standard household or garage receptacle handles 80 continuous amps safely.
What connector does this car use?
The car uses a J1772 connector for Level 2 AC charging. Every non-Tesla EV sold in North America through 2024 uses this standard.

Other vehicles

2026 Lucid Air G Touring XR2026 Lucid Air Pure2026 Lucid Air Sapphire2026 Lucid Air Touring2025 Lucid Air G Touring XR2025 Lucid Air Pure

Charging times derived from EPA data for the 2023 Lucid Air GT P. Electrical requirements follow NEC 625.41, which sizes a circuit at 125% of a continuous load. Always have a licensed electrician verify your panel.