BuyWhatFits

What EV Charger Do You Need for a 2025 Dodge Charger Daytona Scat Pack?

What to buy
A 48 A charger on a 60 A circuit
Your 2025 Dodge Charger Daytona Scat Pack accepts at most 11.0 kW (48 A) of AC power. A larger charger will not charge it faster.

Many buyers waste money on an 80 amp charger their car cannot use. Your Dodge Charger Daytona Scat Pack caps out at 48 amps for Level 2 charging. Buy a unit that matches this limit. Anything bigger sits idle and drains cash.

Matches your car
Emporia Level 2 EV Charger 48A
48 A · J1772 · both
See it on Amazon

The numbers

Maximum AC charging rate11.0 kW (48 A)
Charger size to buy48 A
Circuit breaker required60 A
Outlet / connectionhardwired (a 48 A EVSE must be hardwired -- no household receptacle is rated for it)
Charge portJ1772
Full charge on Level 2about 9.6 hours
Range added per hour (Level 2)about 29 miles
Full charge on a 120 V outletabout 74 hours
Range added per hour (120 V)about 3.8 miles
EPA rated range279 miles
Energy for a full chargeabout 106.0 kWh at the wall

Why 48 amps and not more

The onboard charger draws 11.0 kilowatts, which means 48 amps is the ceiling for AC power intake. Feeding it a larger 60 amp or 80 amp unit yields zero speed gains. The car ignores the extra capacity. Sticking to a 48 amp EVSE fills the 106.0 kWh battery from empty in 9.6 hours. You get 29 miles of range for every hour plugged in.

What the install involves

You need a dedicated 60 amp breaker to feed the 48 amp load safely. Hardwire the unit directly to the supply because no household receptacle is rated for this continuous draw. Bring in a licensed electrician to pull the wire, land it on the new breaker, and check that your main panel has spare capacity. Skip the wall plug entirely and mount the EVSE straight to the wall studs.

Chargers that match this car

Level 2 EV Charger 48A
48 A · J1772 · both · 24.0 ft cable
Energy monitoring built in. Hardwire it for the full 48 A.
See the Emporia Level 2 EV Charger 48A
Pulsar Plus 48A
48 A · J1772 · hardwire · 25.0 ft cable
Compact unit, good for tight garages.
See the Wallbox Pulsar Plus 48A
Home Flex 50A Hardwired
50 A · J1772 · hardwire · 23.0 ft cable
Adjustable from 16 A to 50 A in the app, which helps if your panel is tight.
See the ChargePoint Home Flex 50A Hardwired

Worth having as well

Tesla to J1772 Charging Adapter 80A
Lets a J1772 car use Tesla Destination Chargers and Wall Connectors.
See the Lectron Tesla to J1772 Charging Adapter 80A
J1772 Extension Cable 20ft 40A
For when the charger cable will not reach your car's port.
See the EVCONN J1772 Extension Cable 20ft 40A
As an Amazon Associate we earn from qualifying purchases. Prices and availability are not shown here because they change constantly, so check the current price on Amazon.

Common questions

What connector does this car use?
It uses a J1772 connection. This model year falls in the industry transition to NACS, so many cars ship with a NACS port and include a J1772 adapter. Confirm your exact port type before buying gear.
Can I plug this into a normal wall outlet?
No. Level 1 charging on a standard household outlet takes 74 hours for a full fill and adds only 3.8 miles of range per hour. You need a proper Level 2 setup for daily driving.
Why does the EPA charge time differ from the max rate?
The EPA rated test takes 9.9 hours and yields 28 miles per hour of charge. Standard testing conditions do not always run at the absolute peak AC rate of the vehicle.
Do I need an adapter for Tesla destination chargers?
Yes, if you want to use Tesla gear with your J1772 port. An adapter like the Lectron Tesla to J1772 lets you tap those stations on the road.

Other vehicles

2027 Dodge Charger Daytona Scat Pack2027 Dodge Charger Daytona Scat Pack Rear2027 Dodge Charger Daytona Scat Pack Rear A/S2026 Dodge Charger Daytona R/T2026 Dodge Charger Daytona Scat Pack2026 Dodge Charger Daytona Scat Pack Rear

Charging times derived from EPA data for the 2025 Dodge Charger Daytona Scat Pack. Electrical requirements follow NEC 625.41, which sizes a circuit at 125% of a continuous load. Always have a licensed electrician verify your panel.